To do more than is expected for project and community
RMC Geo-Lab Project Timeline

Project Timeline

A chronological timeline view of all published RMC Geo-Lab projects, displayed latest first with project photos, highlights, category, client and location.

Latest First 4 Projects 23 Photos
4
Projects
2
Featured
23
Photos
4
Completed / Past
0
Upcoming
Reset
May 2026 Latest
20 May
Proposed High-Rise Mixed Development Project
Geotechnical Investigation

Proposed High-Rise Mixed Development Project

Latest
20 May 2026 Colombo, Sri Lanka Private Developer

Comprehensive geotechnical investigation carried out for a proposed high-rise mixed development project.

Highlights
  • The investigation included borehole drilling, Standard Penetration Tests, soil sampling, groundwater observation and laboratory testing.
  • Standard Penetration Tests, soil sampling, groundwater observation The investigation included borehole drilling, Standard Penetration Tests, soil sampling, groundwater observation and laboratory testing.
  • The investigation included borehole drilling, Standard Penetration Tests, soil sampling, groundwater observation and laboratory testing.
  • The investigation included borehole drilling, Standard Penetration Tests, soil sampling, groundwater observation and laboratory testing.
Main Photo
Proposed High-Rise Mixed Development Project
Proposed High-Rise Mixed Development Project
Proposed High-Rise Mixed Development Project
Proposed High-Rise Mixed Development Project
April 2026
Slope Stability Assessment for Infrastructure Corridor
Geotechnical Engineering

Slope Stability Assessment for Infrastructure Corridor

Featured
12 Apr 2026 Southern Province, Sri Lanka Infrastructure Project

Engineering assessment completed for slope stability and ground risk identification along an infrastructure corridor.

Highlights
  • construction safety The study helped improve construction safety, long-term performance and risk management of the project corridor.
  • long-term The study helped improve construction safety, long-term performance and risk management of the project corridor.
  • construction safety The study helped improve construction safety, long-term performance and risk management of the project corridor.
  • The study helped improve construction safety, long-term performance and risk management of the project corridor.
Main Photo
Slope Stability Assessment for Infrastructure Corridor
Slope Stability Assessment for Infrastructure Corridor
Slope Stability Assessment for Infrastructure Corridor
12 Apr
March 2026
5 Mar
Material Testing Support for Building Construction
Material Testing

Material Testing Support for Building Construction

05 Mar 2026 Kandy, Sri Lanka Building Contractor

Field and laboratory testing support provided for quality assurance of construction materials.

Highlights
  • Testing services included concrete-related tests, soil compaction checks, aggregate testing and other quality control
  • included concrete Testing services included concrete-related tests, soil compaction checks, aggregate testing and other quality control
  • Testing services included concrete-related tests, soil compaction checks, aggregate testing and other quality control
Main Photo
Material Testing Support for Building Construction
Material Testing Support for Building Construction
Material Testing Support for Building Construction
March 2024
Slop Stability Analysis at Southern Expressway
Geotechnical Investigation

Slop Stability Analysis at Southern Expressway

Featured
03 Mar 2024 asf abc

Field and laboratory testing support provided for quality assurance of construction materials.

Highlights
  • Also, the old page has fuller PWA success message logic, including Android and PC install messages.
  • Also, the old Deleting one project assignment should not delete the staff/member record. page has fuller PWA success message logic, including Android and PC install messages.
  • Also, the old page has fuller PWA success message logic, including Android and PC install messages.Also, the old page has fuller PWA success message logic, including Android and PC install messages.
  • Deleting one project assignment should not delete the staff/member record.Also, the old page has fuller PWA success message logic, including Android and PC install messages.Also, the old page has fuller PWA success message logic, including Android and PC install messages.
Main Photo
Slop Stability Analysis at Southern Expressway
Slop Stability Analysis at Southern Expressway
Slop Stability Analysis at Southern Expressway
Slop Stability Analysis at Southern Expressway
Slop Stability Analysis at Southern Expressway
Slop Stability Analysis at Southern Expressway
Slop Stability Analysis at Southern Expressway
Slop Stability Analysis at Southern Expressway
Slop Stability Analysis at Southern Expressway
3 Mar
Timeline