Project Timeline
A chronological timeline view of all published RMC Geo-Lab projects, displayed latest first with project photos, highlights, category, client and location.
Proposed High-Rise Mixed Development Project
Comprehensive geotechnical investigation carried out for a proposed high-rise mixed development project.
- The investigation included borehole drilling, Standard Penetration Tests, soil sampling, groundwater observation and laboratory testing.
- Standard Penetration Tests, soil sampling, groundwater observation The investigation included borehole drilling, Standard Penetration Tests, soil sampling, groundwater observation and laboratory testing.
- The investigation included borehole drilling, Standard Penetration Tests, soil sampling, groundwater observation and laboratory testing.
- The investigation included borehole drilling, Standard Penetration Tests, soil sampling, groundwater observation and laboratory testing.
Slope Stability Assessment for Infrastructure Corridor
Engineering assessment completed for slope stability and ground risk identification along an infrastructure corridor.
- construction safety The study helped improve construction safety, long-term performance and risk management of the project corridor.
- long-term The study helped improve construction safety, long-term performance and risk management of the project corridor.
- construction safety The study helped improve construction safety, long-term performance and risk management of the project corridor.
- The study helped improve construction safety, long-term performance and risk management of the project corridor.
Slop Stability Analysis at Southern Expressway
Field and laboratory testing support provided for quality assurance of construction materials.
- Also, the old page has fuller PWA success message logic, including Android and PC install messages.
- Also, the old Deleting one project assignment should not delete the staff/member record. page has fuller PWA success message logic, including Android and PC install messages.
- Also, the old page has fuller PWA success message logic, including Android and PC install messages.Also, the old page has fuller PWA success message logic, including Android and PC install messages.
- Deleting one project assignment should not delete the staff/member record.Also, the old page has fuller PWA success message logic, including Android and PC install messages.Also, the old page has fuller PWA success message logic, including Android and PC install messages.